Contract Information

Check this section of the site for information on contracts awarded and pending. Information will be updated to this section on a regular basis. If you have questions on a particular contract, please email us at askjack@upgrade74.com

Preliminary Stage: 2002 – Spring 2003

Contract: Reconstruct the Forrest Hill bridge as it passes over I-74 in Peoria.

  • Letting Date: August 2, 2002
  • Contract Status: Awarded and work to continue through May 2003
  • Contractor: Halverson Construction Co., Inc.; Springfield, Illinois
  • Consultant firms for construction: R.W. Armstrong; Indianapolis, Indiana
  • IDOT Resident Engineer: Bill Lewis, 309.671.3333

Stage One: June 2003 – December 2004

Contract SC2: Supply an Intelligent Transportation System (ITS) throughout Peoria and East Peoria. ITS is a network of cameras, traffic monitoring devices and message boards that will provide real-time traffic information and help motorists avoid high-traffic areas.

  • Letting Date: March 7, 2003
  • Contract Status: Awarded and work to take place from May 2003 - December 2006
  • Contractor: MasTec North America, Inc.; Atlanta, Georgia
  • Consultant firms for construction: Edwards & Kelcey; Chicago, Illinois
  • IDOT Resident Engineer: Tracie Skaggs, 309.671.3333

Contract 2: Widen Sterling Avenue to six lanes from War Memorial Drive to Overhill Road and reconstruct Gale and University Avenue bridges. Reconstruct Sheridan, Ellis, Broadway bridges in Peoria.

  • Letting Date: April 25, 2003
  • Contract Status: Awarded and work to start mid-June
  • Contractor: Walsh Construction Co.; Chicago, Illinois
  • Consultant firms for construction: V3 Infrastructure Services, LTD; Woodridge, Illinois
  • IDOT Resident Engineer: Steve Dietz, 309.671.3333

Contract 3 & 3A: Completely remove Armstrong, Columbia Terrace, Bigelow bridges. Reconstruct downtown Peoria streets west of Adams (including Knoxville Avenue).

  • Letting Date: April 25, 2003
  • Contract Status: Awarded and work to start mid-June
  • Contractor: Walsh Construction Co.; Chicago, Illinois
  • Consultant firms for construction: Maurer-Stutz, Inc.; Peoria, Illinois
  • IDOT Resident Engineer: Kevin Wheelwright, 309.671.3333

Contract 4 & 4A: Reconstruct Riverfront Drive (Industrial Spur) interchange in East Peoria.

  • Letting Date: April 25, 2003
  • Contract Status: Awarded and work to start mid-June
  • Contractor: Walsh Construction Co.; Chicago, Illinois
  • Consultant firms for construction: Clark Engineering; Peoria, Illinois
  • IDOT Resident Engineer: Imad Mohamed, 309.671.3333

Stage Two: September 2004 – November 2005

Contract 5: Reconstruct westbound and eastbound I-74 lanes from Monroe to the Murray Baker Bridge in Peoria; reconstruct five bridges including Monroe, Madison, Jefferson, Adams and Washington; construct tunnel underneath Adams Street, which will require raising Adams 15 feet; reconstruct Adams Street on ramp; close Murray Baker Bridge from April 1, 2005 - October 1, 2005 and paint it

  • Letting Date: June 11, 2004
  • Contract Status: Awarded and work to start in September
  • Contractor: United Contractors Midwest; Tremont, Illinois
  • Consultant firms for construction: MACTEC Engineering and Consulting; St. Louis, Missouri
  • IDOT Resident Engineer: Nick Volk, 309.671.3333

Contract 6: Reconstruct eastbound I-74 lanes from just west of Sterling to Nebraska; construct new interchange at Sterling Avenue

  • Letting Date: June 11, 2004
  • Contract Status: Awarded and work to start in September
  • Contractor: United Contractors Midwest; Tremont, Illinois
  • Consultant firms for construction: The Upchurch Group, Inc.; Mattoon, Illinois
  • IDOT Resident Engineer: Randy Lafollette, 309.671.3333

Contract 7: Reconstruct Nebraska Avenue overpass; Reconstruct eastbound I-74 lanes from Nebraska to Monroe in Peoria; reconstruct the University and Knoxville ramps; construct a new tunnel underneath Knoxville; reconstruct Perry overpass

  • Letting Date: June 11, 2004
  • Contract Status: Awarded and work to start in September
  • Contractor: United Contractors Midwest; Tremont, Illinois
  • Consultant firms for construction: McDonough & Associates, Inc.; Chicago, Illinois
  • IDOT Resident Engineer: Andy Keyster, 309.671.3333

Contract 9: Reconstruct eastbound I-74 lanes from Riverfront Drive to Washington Street in East Peoria; reconstruct eastbound Washington Street interchange

  • Letting Date: June 11, 2004
  • Contract Status: Awarded and work to start in September
  • Contractor: United Contractors Midwest; Tremont, Illinois
  • Consultant firms for construction: Transystems Corporation; Schaumburg, Illinois
  • IDOT Resident Engineer: Mike Boyer, 309.671.3333

Stage Three: Fall 2005 – December 2006

Contract 10: Reconstruct westbound I-74 lanes from west of Sterling to Nebraska Avenue and the War Memorial Drive interchange including widening and resurfacing of War Memorial Drive from Sterling Avenue to west of University Avenue

  • Letting Date: June 17, 2005
  • Contract Status: Awarded and work to start in fall
  • Contractor: Walsh Construction Co.; Chicago, Illinois
  • Consultant firms for construction: Volkert & Associates, Inc.; Collinsville, Illinois
  • IDOT Resident Engineer: Ben Tellefson, 309.671.3333

Contract 11: Reconstruct westbound I-74 lanes from North Main Street to Washington Street in East Peoria.

  • Letting Date: June 17, 2005
  • Contract Status: Awarded and work to start in fall
  • Contractor: Walsh Construction Co.; Chicago, Illinois
  • Consultant firms for construction: V3 Infrastructure Services, Ltd.; Woodridge, Illinois
  • IDOT Resident Engineer: Bill Lewis, 309.671.3333

Contact Info

For More Information

Email: http://www.dot.state.il.us/email/

Get More Info

Enter your email below and select the types of updates you would like to receive from Upgrade74.com

Unsubscribe

Press
General Updates